Widnes Future Flower
Halton Borough Council

Value: £125,000
Construction of a 14m high wind-powered Flower on the banks of the River Mersey.
The Widnes Future Flower rests on a reinforced in-situ concrete base, it has 120 metallic petals that flutter in the wind and become illuminated by 60 low-powered LEDs in various shades of red, with their intensity varying depending on the wind's strength and direction.
The contract was logistically challenging with the only access to the site through Fiddler’s Ferry Power Station and along a 900m canal tow path, which is in constant use by members of the public.Access for future maintenance has been provided using an ACO Ecoblock system.
The art installation was designed by architects Tonkin Liu through an international competition funded by the NWDA, the Widnes Future Flower is part of the ongoing Widnes Waterfront Regeneration Programme.