The Project
Design and construction of a new clubhouse, access road and car park.
The two storey building, with a footprint of approximately 1000m2, incorporated changing facilities, six shower rooms, a medical room, gymnasium, archery gallery, two lounges with bar facilities and a shop.
The upper floor, with lift facilities for disabled access, included a viewing balcony overlooking the playing area.
Surface run off from the car park area was managed by the design of a Sustainable Drainage System, which incorporated a Stormcell underground storage system with Hydrobrake flow control.
We employed the services of a local architect, C J Partnership, and structural design engineers, BKP, to provide the design elements of the work.