Ground works and civils works for a new Waitrose store in Jesmond, Newcastle-upon-Tyne.
Works included stormwater and foul drainage, ducting, concrete ground beams and isolated foundation bases, sub-base and gas membrane to the ground floor slab, lift shaft and stairwell base construction and construction of three concrete floors.
High specification paving and minor 278 street works were also undertaken, together with the installation of bollards and footpath construction.
Although the restricted size of the site, in addition to co-ordinating the works with numerous contractors resulted in constricted working conditions, the project was managed to meet the programme completion date within the 16 week programme period.